| Area of Work Extent |
Area of Work Extent |
Area of Work Extent |
Area of Work Extent |
Area of Work Extent |
Area of Work Extent |
Area of Work Extent |
| Building Footprint |
Pipes |
Open Spaces |
Road Reserve |
Gravity Wastewater Sewer Pipe |
Pressure Main |
Flammable/Combustible Liquid Container |
| Building Floor Plan |
Pipe Miscellaneous text |
Playing Fields |
Surface (Seal) |
Gravity pipe Miscellaneous Text |
Service Main |
|
| Building Space |
Pits |
Playgrounds |
Pavement |
Pressure Main Wastewater Pipe |
Access Points / Pits / Manholes & Other Structures |
|
| Communication and Data (Point) |
Head/End Walls |
Minor Structures |
Surface (Seal) Centrelines |
Pressure pipe Miscellaneous Text |
Water Hydrants |
|
| Communication and Data Cabling (Polylines) |
Property Connections |
Fences/Walls |
Pathways |
Pits/Access Points |
Meter |
|
| Conduits |
Underground Conduits |
Amenities |
Pathway Centrelines |
Property Connections |
Valves |
|
| Conveyance System (Polygon) |
Underground Conduit Pits |
Gates |
Tactile Ground Surface Indicators |
Wastewater Sewer Fitting |
Fittings |
|
| Conveyance Paths (Polylines) |
OSDS-Linear WSUD Systems |
Bins |
Parking |
Wastewater Sewer Valves |
Pumps |
|
| Doors and Windows |
OSDS-Linear Centrelines |
Services (Point) |
Kerbs, Kerbs & Channel and Shoulder |
Wastewater Sewer Pump |
Reservoir |
|
| Electrical Equipment (Point) |
OSDS-Area (Onsite Stormwater Detention System-Area) |
Services (Linear) |
Table Drain |
Pump Station |
Cathodic Protection |
|
| Electrical Lines (Polyline) |
Water Harvesting Devices (“WHD”) |
Public Art/Memorial |
Traffic Management Devices (Point) |
Pump Station Site |
Conduits |
|
| Fire Protection Equipment (Point) |
Collection pipes for swales |
Landscaping |
Traffic Management Devices (Linear) |
Support Structure |
Tanks |
|
| Fire Protection Lines (Polyline) |
Pits for Swales |
Bore/Ground Water |
Traffic Management Devices (Polygon) |
Other Network Structures |
Electrical Cabling |
|
| Fittings & Fixtures Areas (Polygon) |
|
Irrigation (Point) |
Shelters |
Conduits |
Electrical Equipment |
|
| Fittings & Fixtures Lines (Polylines) |
|
Irrigation (Linear) |
Abutments |
Electrical Cabling |
Instrumentation |
|
| Floor Plan Lines |
|
Emergency Markers (Point) |
Bridges/ Major Culverts |
Electrical Equipment |
Mechanical Equipment |
|
| HVAC Equipment (Point) |
|
Emergency Markers (Linear) |
Signs |
Instrumentation |
Pump Station |
|
| HVAC Lines (Polyline) |
|
Boardwalks |
Trees |
Mechanical Equipment |
Pump Station Site |
|
| HVAC Mechanical Systems (Point) |
|
Playground and Exercise Equipment |
Lighting |
Matching to Existing Infrastructure |
Support Structure |
|
| Plumbing Equipment (Point) |
|
Breakwater |
Vehicle Crossing |
|
Platforms |
|
| Plumbing Lines (Polyline) |
|
Jetties, Piers and Marinas |
Road Safety Barriers |
|
|
|
| Public Toilets |
|
Poles |
Traffic Signals |
|
|
|
| Security Equipment |
|
Piles |
Intelligent Transport Systems Features – Points |
|
|
|
| Signs |
|
Boat Ramps |
Intelligent Transport Systems Features – Lines |
|
|
|
| Stairs |
|
Marine Safety and Assist Facility |
Intelligent Transport Systems Features – Areas |
|
|
|
| |
|
Retaining Walls |
|
|
|
|